Thuong Kon Tum Hydropower Project: VAC, Fire Fighting, Fire Detection system
PROJECT INFORMATION:
Project name: Thuong Kon Tum Hydropower Project
Client: Andritz Hydro GmbH
Turbine type: Pelton
Capacity: 220 MW
Scope of work: VAC, Fire Fighting, Fire Detection system – design, supply equipment & materials, guiding of installation and commissioning.
Location: Kontum province, Vietnam
Completion date: March/2020
Key highlight:
- Highest hydraulic head of hydropower plant in Vietnam – 1,147m.
- Entire Power House, Transformers are located deep inside the mountain.
- Install FF piping & VAC ducting in very difficult conditions. Vertical shaft 256m high and cable tunnel 500m long.
- Big quantity of materials: 8,000m of FF pipe & 20,000m2 of air duct.