PROJECT INFORMATION:
Project name: Nam Theun 1 Hydropower Plant (NT1 HPP)
Client: Andritz Hydro GmbH
Turbine type: Francis
Capacity: 650MW (2x260MW + 1x130MW)
Scope of work:
– Site approach: Assessment the damage to systems supply by Probuild, provide detailed reports, and solution plans;
– Quickly restore HVAC system to normal operation, improve air quality, and reduce moisture in Powerhouse;
– Provide replacement equipment and materials in a tight/ urgent time schedule;
– Provide the services of supervisor for reparing process, join testing & commissioning systems after restoration.
Location: Ban Phonchaleurn, Pakkading district, Bolikhamxai province, Lao PDR
Execution time: 2025 – 2026